| AR# | 18309 |
| Topic | SW-Incremental Design |
| Last Modified | 2009-06-02 00:00:00.0 |
| Status | Active |
Keywords: ISE6, pack, hierarchical, flows, design, driven, hierarchy, guide
The Development System Reference Guide states that the "map-timing" option is not supported with any guide flows. Does this imply that the option is not supported with Incremental Design?