^

AR# 30043 10.1 Timing Analyzer - Cross-probe correlated path to tech view is empty

It always happens to a partition design which has PERIOD path. Cross-probing paths from the timing report to the translated (correlated) technology view results in an empty schematic.

This problem is scheduled to be fixed in the next major release of the design tools.

AR# 30043
Date Created 06/12/2008
Last Updated 12/15/2012
Status Active
Type General Article
Feed Back