In order for the PLLE2 to generate the 6.25% duty cycle on the sync pulse, the frequency must not be lower than 200 MHz.
The minimum frequency is scheduled to be set to 200 MHz in the MIG 7 Series GUI (starting with the ISE 13.2 softwarerelease).
| Answer Number | Answer Title | Version Found | Version Resolved |
|---|---|---|---|
| 40050 | MIG 7 Series v1.1 - Release Notes and Known Issues for ISE Design Suite 13.1 | N/A | N/A |