AR# 7230

2.1i Design Manager - MPPR cannot be run with delay-based cleanup using the Design Manager GUI


2.1i, mppr, multi, pass, place, and, route, delay, based, cleanup

Urgency: Standard

General Description:
When running MPPR, can we also run delay-based cleanup during each pass?

If you set the implementation options to use delay-based cleanup, and then run MPPR,
when you look at the logfile report, delay-based cleanup wasn't run, no -d option
and no mention of running delay-based cleanup.


Use the DOS command line version of running par.
Simply cut-and-paste the MPPR command line from the MPPR report,
adding the -d option to it.
This will run MPPR with delay-based cleanup for every pass.
AR# 7230
Date Created 08/09/1999
Last Updated 04/27/2006
Status Archive
Type General Article