AR# 30043

10.1 Timing Analyzer - Cross-probe correlated path to tech view is empty

Description

It always happens to a partition design which has PERIOD path. Cross-probing paths from the timing report to the translated (correlated) technology view results in an empty schematic.

Solution

This problem is scheduled to be fixed in the next major release of the design tools.

AR# 30043
Date 05/22/2014
Status Archive
Type General Article