Design Closure: Power Constraints, Best Practices for an Accurate Report Power Estimation

Learn how to accurately estimate design power from concept to finish, apply proper power constraints, and minimize power along the way.  NI will also discuss how Vivado' s latest updates on timing closure tools have helped them with design closure on _their toughest designs.